Accurate installation method and steps of the new type of hammer crusher: according to the native share range select installation location, at the same time ensure adequate inspection room.
The debugging of hammer crusher :
1. The rotor had passed before they go out balance processing, users generally do not need to make a balance test again, when replacing hammer head and the rotor parts, a balanced configuration should be done.
2. The main unit should be balanced, spindle levelness error is less than 1 mm/m, master-slave pulley in uniform plane, tightness of the belt can be adjusted reasonably, fixed idea.
3. Check all parts installation position are mobile, deformation, tighten all bolts, check whether the seal is good.
4. Check electrical wiring and tighten situation, adjust the time delay relay and overload protector, processing circuit, to test motor, choose appropriate specifications of the fuse.
5. Check whether actions of hydraulic system are reliable, have without leakage phenomenon.
6. Remove foreign bodies in hammer crusher, move the rotor with the hand, for friction, collision.
HeNan Hongji Mine Machinery CO.,LTD is a crushing equipment professional manufacturers, strong technical force, rich practical experience. Related products have crushing line,stone crushing plant,mining production line,cement line,ceramsite line.zrf