The following items must be carried out before the machine starts:
1, on careful inspection and comprehensive inspection equipment;
2, check the role of lubrication equipment and tubing;
3, check to materials and control equipment and instrumentation effect;
4, check the role of starting equipment;
5, check the belt, chain, etc. clear conditions;
6, check whether the safety devices and their status is;
7, check the machine for all parts of the role;
8,check and remove debris outside the machine, so as not to interfere with the machine start;
The following items must be carried out after work:
1, after work and clean the machine must be cleaned;
2, promptly check the use of machine parts;
3, check and consider the role lubrication device and tubing correction when necessary;
4, check the bolt connection, wedge connections, ring, etc., wipe the placement of bolts, nuts, washers, cotter pins, etc., were inappropriate replacement;
5, belts, chains and connection check and shall remove irregularities.
Hongji also reminds you that there must be security conscious while operating equipment, basic is again trivial, if we continue to do these things, not only effectively extending the life of the crusher, but also ensuring personal safety.zrf
Web:http://www.hsnee.com
http://www.chinahongji.com
Stone Crushing Plant
http://www.hsnee.com/product/Stone_Crushing_Line.html
Ore Beneficiation Line
http://www.hsnee.com/product/Beneficiation_Production_Line.html
Cement Production Plant
http://www.hsnee.com/product/Cement_Production_Line.html
没有评论:
发表评论