2015年12月16日星期三

Stone Crushing Plant Equipment Can Not Be Ignored during Operation

Mine accidents have been scary for, Stone crushing plant is not only large-scale equipment, is the most likely potential accidents triggered, which requires that we need to be more careful in the process of crushing equipment operation.

The following items must be carried out before the machine starts:
1, on careful inspection and comprehensive inspection equipment;
2, check the role of lubrication equipment and tubing;
3, check to materials and control equipment and instrumentation effect;
4, check the role of starting equipment;
5, check the belt, chain, etc. clear conditions;
6, check whether the safety devices and their status is;
7, check the machine for all parts of the role;
8, check and remove debris outside the machine, so as not to interfere with the machine start;
The following items must be carried out after work:
1, after work and clean the machine must be cleaned;
2, promptly check the use of machine parts;
3, check and consider the role lubrication device and tubing correction when necessary;
4, check the bolt connection, wedge connections, ring, etc., wipe the placement of bolts, nuts, washers, cotter pins, etc., were inappropriate replacement;
5, belts, chains and connection checks and shall remove irregularities.

Hongji also remind you that there must be security conscious while operating equipment, basic is again trivial, if we continue to do these things, not only can effectively extend the life of Stone crushing plant, but also to ensure personal safety.zrf